Evaluates relocation and performance of Kansas City National Security Campus operations in Building 23
Assesses a proposal to fund the MFWP in the removal of non-native fish species through the use of a fish toxicant, & reintroduction of native fish.
EA and Draft FONSIs to assess the potential impacts of the 2017 Facilities Master Plan Projects at the Training Site at Ft. Chaffee, AR.
A final EA and FONSI for a proposal by BPA to fund USFWS to translocate up to 50 Columbian white-tailed deer from an island in the Columbia River
DOE prepared a final EA and FONSI for expanding capabilities at the Power Grid Test Bed at INL.
Assesses a proposal to construct and operate a third marine berth at the existing Sabine Pass LNG Terminal.
Draft EA for BPA's proposal to provide funds to the Nez Perce Tribe for cont'd funding for the JCAPE hatchery program in Idaho.
Analyzes a proposed solar photovoltaic system and associated facilities in New Mexico.
Analyzes 12.6-mile long Avista Utilities 115-kV transmission line rebuild project on the Hanford Site.
NNSA draft supplemental EA updated strategies reducing wildland fire risk promoting healthy forests Los Alamos National Laboratory