Draft DOE/EA-2144 on environmental impacts of the Oak Ridge Enhanced Technology and Training Center (ORETTC). Comment period closes September 21, 2020
Revised Federal building energy efficiency performance standards for new Federal buildings
Draft EA-2135 for restoration of a section of Birch Creek and associated floodplains in Umatilla County, Oregon.
Final DOE/EA-2115 for disposal of DWPF recycle wastewater at a commercial low-level radioactive waste disposal facility.
Revised Draft DOE/EA-2152 (August 2020) for the Beale AFB-WAPA Interconnection Project.
Draft DOE/EA-2121 on the proposed reclamation of the Burro Mines Complex in San Miguel County, Colorado.
Final EA (DOE/EA-2116)/FONSI for transport/disposition of waste and excess materials from deactivation activities at Paducah Gaseous Diffusion Plant.
Draft EA (July 2020) for the Sterling Solar 1 Interconnection Project (DOE/EA-2124) in Arizona.
Final DOE/EA-2128 for the Large-Pilot Testing Facility Project at a coal-fired power plant in Springfield, Illinois.
Final EA-2133 for river and stream restoration projects in the Lemhi River Valley.