Environmental Assessment (EA) for Big Flat Electric Right of Way; Multiple Locations (DOE/EA-2157).
Draft DOE/EA-2145 for the Lithium Processing Facility at the Y-12 National Security Complex; Oak Ridge, Tennessee.
Final DOE/EA-2144 on environmental impacts of the Oak Ridge Enhanced Technology and Training Center (ORETTC).
BPA adoption, as Final DOE/EA-2118, of USDA/NRCS EA for improving the Eastside Lateral Pipeline, Hood River County, Oregon.
Draft EA (October 2020) for the Sterling Solar 2 Interconnection Project (DOE/EA-2141) in Arizona.
Final DOE/EA-2152 for the Beale AFB-WAPA Interconnection Project.
Environmental Assessment (EA) for Norval Electric Right of Way; Multiple Locations (DOE/EA-2156).
Final DOE/EA-2152 (November 2020) for the Beale AFB-WAPA Interconnection Project.
Updating, by rule, energy efficiency standards for new Federal commercial and multi-family high-rise residential buildings.
Final EA (October 2020) for the Sterling Solar 1 Interconnection Project (DOE/EA-2124) in Arizona.