Draft EA (July 2020) for the Sterling Solar 1 Interconnection Project (DOE/EA-2124) in Arizona.
Final DOE/EA-2128 for the Large-Pilot Testing Facility Project at a coal-fired power plant in Springfield, Illinois.
Final EA-2133 for river and stream restoration projects in the Lemhi River Valley.
DOE/EA-2140 evaluates impacts of a weir fish trap on Pettit Lake Creek, Idaho.
Final DOE/EA-2122, for a second fiber optic line for Los Alamos National Laboratory.
DOE/EA-2130 for future development of the Pacific Northwest National Laboratory (PNNL) Sequim Campus.
Final programmatic EA (DOE/EA-2113) for Grazing Activities at Office of Legacy Management Sites.
Draft DOE/EA-2128 for the Large-Pilot Testing Facility Project at a coal-fired power plant in Springfield, Illinois.
Final EA and FONSI for a proposal to rebuild the 21-mile-long, 115-kilovolt Holcomb-Naselle transmission line.
Draft DOE/EA-2152 (January 2020) for the Beale AFB-WAPA Interconnection Project.