Environmental Assessment (EA) for Norval Electric Right of Way; Multiple Locations (DOE/EA-2156).
Final DOE/EA-2152 (November 2020) for the Beale AFB-WAPA Interconnection Project.
Updating, by rule, energy efficiency standards for new Federal commercial and multi-family high-rise residential buildings.
Final EA (October 2020) for the Sterling Solar 1 Interconnection Project (DOE/EA-2124) in Arizona.
Draft DOE/EA-2050 for the Marys Peak BPA Communications Site.
BPA adopted, as DOE/EA-2150, a NMFS EA on lethal removal of sea lions to reduce predation impacts on salmon and steelhead in the Columbia River Basin.
DOE adopted the National Science Foundation EA for the LIGO STEM Exploration Center at Hanford and issued a FONSI.
Draft DOE/EA-2126, Columbia River Basin Tributary Habitat Restoration Programmatic EA.
Draft EA includes analysis of certain hatchery programs being considered for funding by BPA
Draft DOE/EA-2144 on environmental impacts of the Oak Ridge Enhanced Technology and Training Center (ORETTC). Comment period closes September 21, 2020