DOE prepared this Draft EA for the ICL Specialty Products Inc. Commercial-scale Domestic Battery Cathode Manufacturing (DOE/EA-2229).
Department of Energy prepared a draft Environmental Assessment for the Microporous Assets-Project Stellar (DOE/EA-2272). Comment period closes January 3, 2025.
DOE prepared this Final EA and FONSI for the Rivian Stanton Springs North, Morgan and Walton Counties, Georgia (DOE/EA-2251).
DOE prepared this Final EA and Mitigated FONSI for the Renewable Fuels and Biomass Energy Facility Conversion Project (DOE/EA-2275).
Final Environmental Assessment for Off-site Depleted Uranium Manufacturing; Multiple Locations in TN (DOE/EA-2252).
NETL prepared a Draft EA (DOE/EA-2237) for the Solvay Battery-Grade Polyvinylidene Fluoride (PVDF) Manufacturing Facility project in Richmond County, Georgia.
Department of Energy's Loan Programs Office prepared a draft EA and draft FONSI for the ATLiS Project (DOE/EA-2279).
DOE's Loan Programs Office prepared a draft environmental assessment for Rivian Stanton Springs North (DOE/EA-2251).
DOE's Loan Programs Office prepared an EA and FONSI for the Convergent Puerto Rico Photovoltaic and Battery Energy Storage System Portfolio (DOE/EA-2269).
Western Area Power Administration has prepared a Draft Environmental Assessment for the MPP-Q01 Interconnection Project (DOE/EA-2208).