Final Environmental Assessment (DOE/EA-2224) for the Shelton-Fairmount Transmission Line Rebuild and Fiber Optic System Replacement Project.
Final EA and Finding of No Significant Impact for Molten APEX – Integrated Sustainable Battery Active Material and Precursor Production Plant Project (DOE/EA-2205).
Environmental Assessment and Draft Finding of No Significant Impact for Hanwha QCells Project Redeemer, Bartow County, Georgia (DOE/EA-2257).
Final environmental assessment for the TerraPower, LLC’s Test and Fill Facility Project (DOE/EA-2217) in Wyoming.
Draft Environmental Assessment and Draft Finding of No Significant Impact for e-VAC Magnetics Project Eagle Magnet Manufacturing Plant, Sumter, South Carolina (DOE/EA-2255).
Final Environmental Assessment for Umatilla Hatchery Programs (DOE/EA-2249).
Final EA, Evaluation of the potential environmental impacts of DOE’s Supplemental Notice of Proposed Rulemaking, 10 CFR Parts 433 and 435 to add the new fossil fuel-generated energy consumption standards. This EA replaces DOE/EA-1778, which was cancelled.
Revised Draft Environmental Assessment for the North Dakota CarbonSAFE: Tundra Project (DOE/EA-2197).
Draft Environmental Assessment and Draft Finding of No Significant Impact for PyroThin® Aerogel Manufacturing Facility for EV Battery Safety; Register, Georgia (DOE/EA-2253).
The Federal Energy Regulatory Commission (FERC) prepared an EA for the Elba Liquefaction Optimization Project (DOE/EA-2293).