Draft Environmental Assessment (DOE/EA-2224) for the Shelton-Fairmount Transmission Line Rebuild and Fiber Optic System Replacement Project.
Final EA for Molten Chloride Reactor Experiment (MCRE) Project (EA-2209).
EA and FONSI for the EEW American Offshore Structures.
Draft Environmental Assessment (DOE/Ea-0555) for the Cirba Solutions - Lithium-Ion Battery Recycling to Produce Battery-Grade Raw Materials.
Final EA evaluate the impacts of disposal of contaminated process equipment from the Savannah River Site (SRS).
Draft Environmental Assessment for Evaporation Pond at the Shiprock, New Mexico, Disposal Site (DOE/EA-2195).
Western Area Power Administration prepared a Final EA (DOE/EA-2161) and FONSI for the North Bend Wind Project.
Draft EA for Molten APEX – Integrated Sustainable Battery Active Material and Precursor Production Plant Project (DOE/EA-2205).
DOE prepared an EA (DOE/EA-2215) to evaluate the Uma-Birch Floodplain Reconnection Project.
DOE prepared an EA (DOE/EA-2207) to evaluate the Klickitat Hatchery Spring Chinook Upgrades Project.