Final EA for Kansas City National Security Campus KCNExT Project (DOE/EA-2225) for operations at the KCNSC Botts Campus and to provide the flexibility to expand, reconfigure and/or move select operations within the KCNSC.
Draft Environmental Assessment for the Los Alamos National Laboratory Electrical Power Capacity Upgrade Project (DOE/EA-2199).
EA and FOSNI for Redwood Materials, Inc., McCarran, NV.
Draft Environmental Assessment for Plasma Low-cost Ultra Sustainable Cathode Active Material (PlusCAM) Project (DOE/EA-2223)
Draft Site-Wide Environmental Assessment (SWEA) of the Kansas City National Security Campus, New Mexico Operations (KCNSC NMO) (DOE/EA-2231)
Draft Environmental Assessment for Activities in Support of the Y-12 National Security Complex Materials Manufacturing Mission (Y-12 MM EA) (DOE/EA-2218)
Final Environmental Assessment for Evaporation Pond at the Shiprock, New Mexico, Disposal Site (DOE/EA-2195).
Final Environmental Assessment (DOE/EA-2213) for the Cirba Solutions - Lithium-Ion Battery Recycling to Produce Battery-Grade Raw Materials.
Draft EA for New Fortress Energy Altamira FLNG Project
DOE prepared an EA (DOE/EA-2207) to evaluate the Klickitat Hatchery Spring Chinook Upgrades Project.