Final Environmental Assessment for X-energy Helium Test Facility (DOE/EA-2230).
Office of NEPA Policy and Compliance
February 14, 2024X-energy Helium Test Facility Oak Ridge, Tennessee
This EA evaluates the potential environmental impacts of a proposal, (the X-energy Helium Test Facility) that consists of the design and construction of a facility to test critical structures, systems, and components that are considered First-in-a-While in a hard, high temperature helium environment to increase the technical readiness level of X-energy’s design of the high temperature gas cooled Small Modular Reactor.
For more information, see X-energy Helium Test Facility.