The U.S. Department of Energy (DOE) plans to deactivate, demolish, and disposition ancillary small structures, piping or equipment, and tanks at the Paducah Site that supported the former uranium enrichment facilities and are aging and/or deteriorated, and no longer needed.
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment, transmission towers, and auxiliary electrical components at the Paducah Site that are no longer needed.
The Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes to conduct site characterization and monitoring, air and stack effluent monitoring, plant and animal sampling, surface water sampling, and actions including, but not limited to, geological, geophysical, and geochemical investigations, engineering surveys, and mapping.
The U.S. Department of Energy (DOE) plans to lease approximately 785 acres of real property (Leasing Parcel B) at the Paducah Gaseous Diffusion Plant (PGDP) located in McCracken County, Kentucky.
The U.S. Department of Energy (DOE) plans to lease approximately 188 acres of real property (Leasing Parcel C) at the Paducah Gaseous Diffusion Plant (PGDP).
Kentucky Utilities Company will install a SCR system to its coal-fired Unit 2 at Ghent Generating Station. The SCR system will be capable of reduci…
The U.S. Department of Energy (DOE) plans to complete site preparation for a new pump and treat facility at the Paducah Gaseous Diffusion Plant (PGDP).
The U.S. Department of Energy (DOE) Paducah Site proposes to continue to manage polychlorinated biphenyl (PCB)-containing materials per 40 CFR Part 761, Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions, the Uranium Enrichment Toxic Substances Control Act (TSCA) Compliance Agreement (CA), and the TSCA Approval for Disposal of PCB Bulk Product (Mixed) Waste, and any other applicable agreements or policies, as needed.
Albany - Wayne County 69 kV transmission line rebuild project. Proposed project would involve complete 69kV transmission line rebuild within the ex…