Categorical Exclusion Determinations: Bettis Atomic Power Laboratory

Categorical Exclusion Determinations issued by Bettis Atomic Power Laboratory.

The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.