Categorical Exclusion Determinations issued by Bettis Atomic Power Laboratory.
The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.
The CMOSS Switchgear Electrical Power Upgrade and BMOSS Refeed Project supports shifting electrical loads due to current construction activities, future electrical capacity expansions, and upgrades various aspects of the power distribution system.
The project will modify the physical facilities at BLS.
The scope of the Valley National Gas Property Acquisition includes procurement of the existing industrial complex adjacent to the Bettis Laboratory.
The scope of the Bettis J-Building Mezzanine Project is to design, fabricate, and install a mezzanine with two sets of access stairs around the inside perimeter of the Bettis J-Building to accommodate relocation and upgrade of the large hot isostatic...
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
The scope of the project is proposed to alter the existing upper CSR area with minor regrading to place gravel for the parking area and ingress-egress driving aisles.
The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001