Categorical Exclusion Determinations issued by Bettis Atomic Power Laboratory.
Phase 2 of this project will remove five test stations and the associated utilities.
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
J-Building Cryogenic Liquid Bulk Tank Replacement Project
The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
The scope of the Upgrade to the Environmental Mechanical Test Facility (EMTF) Infrastructure project is to refurbish a portion of the facility...