A final EA and FONSI for a proposal by BPA to fund USFWS to translocate up to 50 Columbian white-tailed deer from an island in the Columbia River
DOE prepared a final EA and FONSI for expanding capabilities at the Power Grid Test Bed at INL.
FONSI for the 12.6-mile long Avista Utilities 115-kV transmission line rebuild project on the Hanford Site
FONSI for new strategies for addressing wildland fires at Los Alamos National Laboratory.
A Final EA and FONSI for constructing and making operational the proposed Energy Conversion Technology Center in Morgantown, West Virginia.
FONSI issued for a proposed solar photovoltaic system and associated facilities in New Mexico.
FONSI for Site-Wide EIS for Continued Operations of the Kaua'i Test Facility, Sandia National Laboratories, Hawaii (DOE/EA-2089).
A FONSI for a proposal to site, construct, and operate pipeline, natural gas liquefaction and export facilities near Freeport in Brazoria County, TX.
Evaluate the effects of aerial application of soil inoculant and herbicide to control cheatgrass spread in the wake of the 2012 Brown’s Gulch wildfire
Revised FONSI for expansion of borrow areas at the Hanford Site because a MAP issued with the initial FONSI in 2013 was not required