Proposal to construct and operate the Proton Improvement Plan (PIP)-II Project (the Project) at the Fermi National Accelerator Laboratory (Fermilab)
Proposal to fund Lower Columbia Estuary Partnership to restore portions of the Columbia River Floodplain at Steigerwald Lake National Wildlife Refuge
Proposal to make about 10 MT of HALEU stored at INL available for R&D and demonstration
EA-2077: North Access Road Bypass near the Waste Isolation Pilot Plant
Spar Canyon-Round Valley Access Road System Improvements, Custer County, Idaho
LEEDCo’s Project Icebreaker, an Offshore Wind Advanced Technology Demonstration Project, Offshore Cleveland, Ohio, in Lake Erie.
A FONSI for a proposal to construct, connect, operate, and maintain a 5-mile-long 138-kV and 230-kV alternating current electric transmission system.
Adoption of USGS EA as DOE/EA-2090 and FONSI for a marine seismic survey in the northwestern Atlantic Ocean.
Proposed Changes for Analytical Chemistry and Materials Characterization at the Radiological Laboratory/Utility/Office Building, LANL
FONSI for Palmer’s Creek Wind Farm.