Assess potential impacts of the 2017 Facilities Master Plan Projects at Ft. Chaffee, AR.
Evaluates relocation and performance of Kansas City National Security Campus operations in Building 23
Assesses a proposal to fund the MFWP in the removal of non-native fish species through the use of a fish toxicant, & reintroduction of native fish.
A final EA and FONSI for a proposal by BPA to fund USFWS to translocate up to 50 Columbian white-tailed deer from an island in the Columbia River
DOE prepared a final EA and FONSI for expanding capabilities at the Power Grid Test Bed at INL.
FONSI for the 12.6-mile long Avista Utilities 115-kV transmission line rebuild project on the Hanford Site
FONSI for new strategies for addressing wildland fires at Los Alamos National Laboratory.
A Final EA and FONSI for constructing and making operational the proposed Energy Conversion Technology Center in Morgantown, West Virginia.
FONSI issued for a proposed solar photovoltaic system and associated facilities in New Mexico.
FONSI for Site-Wide EIS for Continued Operations of the Kaua'i Test Facility, Sandia National Laboratories, Hawaii (DOE/EA-2089).