Based on DOE/EA-2140, FONSI and mitigation action plan for a weir fish trap on Pettit Lake Creek, Idaho.
FONSI based on DOE/EA-2115 for disposal of DWPF recycle wastewater at a commercial low-level radioactive waste disposal facility.
Final EA (DOE/EA-2116)/FONSI for transport/disposition of waste and excess materials from deactivation activities at Paducah Gaseous Diffusion Plant.
Based on DOE/EA-2128, FONSI for the Large-Pilot Testing Facility Project at a coal-fired power plant in Springfield, Illinois.
FERC led, with EERE cooperating, EA evaluating a 20 MW marine hydrokinetic testing infrastructure.
Based on EA-2133, FONSI for river and stream restoration projects in the Lemhi River Valley.
Based on DOE/EA-2113, FONSI for proposed grazing activities at Office of Legacy Management sites.
Based on DOE/EA-2122, FONSI for a second fiber optic line for Los Alamos National Laboratory.
FONSI and mitigation action plan for Longley Meadows Fish Habitat Enhancement Project (DOE/EA-2100).
Final EA and FONSI for a proposal to rebuild the 21-mile-long, 115-kilovolt Holcomb-Naselle transmission line.