DOE/EA-2220: Documents Available for Download

RSS
Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmisison line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Larmie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-kV H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances.
The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) for a proposed action to demolish and remove 36 facilities from the West Valley Demonstration Project site in West Valley, New York. Based on the analyses in the EA and considering public comments, DOE has determined that the proposed action is not a major action significantly affecting the quality of the human environment.
Banner Color
Light Text on a Dark Overlay (Default)