DOE/EA-2220: Documents Available for Download

RSS
The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1605) to analyze the potential environmental impacts of the proposed construction and operation of new biomass cogeneration and heating facilities located at the Savannah River Site (SRS). DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment . Therefore, the preparation of an environmental impact statement (EIS) is not required and DOE is issuing this finding of no significant impact (FONSI).
Disposition of Radioactively Contaminated Nickel Located at the East Tennessee Technology Park, Oak Ridge, Tennessee, and the Paducah Gaseous Diffusion Plant, Paducah, Kentucky
Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino (νe) Appearance Experiment (NOvA) at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota
This Environmental Assessment (DOE/EA-1570) provides information and analysis of proposed U.S. Department of Energy (DOE) activities associated with constructing and operating facilities for a new neutrino physics research program called NOvA. DOE has determined that the proposed action doesn't constitute a major federal action significantly affecting the quality of the human environment.
The Bonneville Power Administration (BPA) announces its environmental findings on the
Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the
existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam
in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho.
In accordance with the Department of Energy (DOE) National Environmental Policy Act (NEPA) implementing regulations, DOE evaluated the potential environmental impacts that would result from three actions at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site: 1) Proposed Construction and Operation of Research Support Facilities (RSF), 2) Infrastructure Improvements (Phase I), and 3)Upgrades to the Thermochemical User Facility (TCUF) and addition of the Thermochemical Biorefinery Pilot Plant (TBPP).
The Department of Energy (DOE) is proposing an action consisting of three site development projects at the National Renewable Energy Laboratory’s (NREL) South Table Mountain (STM) site at Golden, Colorado:
Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex;
Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development);
Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant (TBPP).
Banner Color
Light Text on a Dark Overlay (Default)