Herbicide Application at 40 Substations Located in Arizona During Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Herbicide Application at Four Substations: Amargosa, Boulder City, Henderson, and Mead located in Nevada during Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Re...
"Herbicide Application at Two Substations: Kayenta and Long House Valley Located on the Navajo Nation During Fiscal
Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Reg...
Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Reg...
Herbicide Application at One Substation: Lone Butte, located on the Gila River Indian Community During Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation CX(s) Applied: B4.12 Date: 06/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line CX(s) Applied: B4.11 Date: 06/21/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Pest Control within Buildings at 44 Substations in Arizona, California and Nevada CX(s) Applied: B1.3 Date: 06/06/2013 Location(s): Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Liberty Substation Transformer Replacement Project, Maricopa County, Arizona CX(s) Applied: B4.11 Date: 06/06/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Parker-Gila 161 Kilovolt Transmission Line Maintenance Project, Structure 92/1 to 94/9 CX(s) Applied: B1.3 Date: 06/05/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Gila Knob Transmission Line Crossarm Replacement at Structure 18/3 CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region