ED2-ED4 Transmission Line Rebuild Project CX(s) Applied: B1.3Date: 41648 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10. CX(s) Applied: B1.3 Date: 01/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Parker-Gila 161 Kilovolt Transmission Line - Structure 109-8 Relocation CX(s) Applied: B1.3 Date: 12/18/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Davis-Parker 230 Kilovolt Transmission Line- Marker Ball(s) Replacement CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Hot Crossarm Changeout Training at 6 Structures CX(s) Applied: B1.3 Date: 12/16/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Saguaro-Tucson 115 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 12/03/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Hazard Tree Removal Along the Prescott Peacock 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 11/22/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Protection and Communication Facilities Maintenance CX(s) Applied: B1.3, B1.7, B1.19 Date: 11/08/2013 Location(s): Arizona, Nevada, California, Utah Offices(s): Western Area Power Administration-Desert Southwest Region
Oracle Substation - Breaker Support Work CX(s) Applied: B1.3 Date: 10/30/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Structure 112-4 LIBPAD1 230-kilovolt Transmission Line "Live Line" Maintenance Training CX(s) Applied: B1.2 Date: 10/25/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region