BrightNight, LLC (Yuma BN, LLC) is constructing a 9-mile 230-kilovolt (kV) transmission line from their Sidewinder Substation to the existing Arizo…
WAPA is proposing to repair the Preston Mesa Communication Tower located on the Navajo Nation in Coconino County, AZ. All work will be completed wi…
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection at WAPA’s existing Electrical District 5 230-kilovolt…
WAPA is proposing a one-time relocation of the Casa Grande substation perimeter fence located on the west side of the facility and the removal of t…
The Salt River Project (SRP) is proposing to build a new double circuit 69-kilovolt (kV) transmission line near Ray Road in Section 30, Township 1 …
The Salt River Project (SRP) is proposing to build a new double circuit 69-kilovolt (kV) transmission line near Ray Road in Section 30, Township 1 …
The Desert Southwest Region (DSW) of the Western Area Power Administration proposes to extend the existing Ancillary Service, Transmission Losses, …
The Marana Upgrade Project (Project) is proposed by Arizona Electric Power Cooperative (AEPCO) to rebuild the existing Marana Substation within the…
The Western Area Power Administration (WAPA), Desert Southwest Region (DSW), conducts routine vegetation management activities on existing transmis…
The Apache GT5 and GT6 Generation Project (Project) is proposed by the Arizona Electric Power Cooperative (AEPCO), a rural member-owned generation …