The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) will acquire a 30-foot-wide perpetual access route along the west…
Specifically, the project team will deploy, test, and validate a prototype AI system across an electric bus fleet with a goal to verify cost saving…
The Desert Southwest Region (DSW) of the Western Area Power Administration proposes to extend the existing transmission service rates for the Pacif…
WAPA proposes to design and construct new power infrastructure to upgrade nine of the existing well sites and power three additional well sites.…
WAPA proposes to replace twenty temporary wooden structures and one existing steel monopole with new steel monopoles.…
Project includes the removal of all abandoned-in-place 161-kV equipment, structures, bus and foundations and construction of a new 69-kV switchyard…
The Western Area Power Administration (WAPA) proposes to conduct a Phase II Environmental Site Assessment (ESA) to evaluate the extent of possible …
The Western Area Power Administration (WAPA) Desert Southwest Region (DSW) plans to replace the main entrance gate of the north fence line to Mead …
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes three new formula rates for Energy Imbalance Market (EIM…
Western Area Power Administration (WAPA) is proposing to update the Boulder Canyon Project (BCP) rate-setting formulas for electric service and the…