The Western Area Power Administration (WAPA) is proposing to repair an existing conductor line at structures 217-2 to 217-3 of the Flagstaff to Pin…
The Western Area Power Administration (WAPA) is proposing to grade existing access roads within the current legal Right-of-Way for the Peacock to P…
The Western Area Power Administration (WAPA) is responding to an interconnection upgrade request by GridLiance West LLC (GridLiance) fo rebuilding …
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
The Western Area Power Administration (WAPA) is proposing to replace broken/malfunctioning insulators on the Mead - Perkins (MED-PES) 500-kV transm…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
Western Area Power Administration (WAPA) plans to issue a license agreement to GridLiance West, LLC (GridLiance) in support of geotechnical investi…
The Desert Southwest Region (DSW) routinely operates and maintains more than 243 substations, switch-yards, and communication sites. Routine mainte…
The Western Area Power Administration (WAPA) is proposing to dispose of out-of-service equipment at various WAPA facilities throughout Arizona. The…