The proposed action would involve repairing ROW access roads to and from each structure and reclaiming the existing ROW staging areas (work-pads) …
Office of NEPA Policy and Compliance
June 11, 2020The proposed action would involve repairing ROW access roads to and from each structure and reclaiming the existing ROW staging areas (work-pads) under each structure within each transmission line system.