Categorical Exclusion Determinations: Western Area Power Administration-Desert Southwest Region

Emergency Installation of Concrete Pad for Western's Communication Tower at Valley Farms Substation CX(s) Applied: B4.6 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Liberty Substation - Vegetation Management CX(s) Applied: B1.3 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Outgrant to Southwest Gas for an Underground Natural Gas Distribution Pipeline at Coolidge Substation CX(s) Applied: B1.24 Date: 02/18/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Glen Canyon Substation 345 Kilovolt - Sulfur Hexafluoride and Concrete Pad Installation CX(s) Applied: B4.6 Date: 02/06/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Henderson 230 Kilovolt Switchyard (Erosion Control) CX(s) Applied: B1.3 Date: 02/06/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Substation Maintenance and Renovation Activities for 2014 CX(s) Applied: B1.3 Date: 01/23/2014 Location(s): Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Blythe-Knob 161 Kilovolt Transmission Line, Structure Maintenance Project CX(s) Applied: B1.3 Date: 01/21/2014 Location(s): California, California Offices(s): Western Area Power Administration-Desert Southwest Region
Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10. CX(s) Applied: B1.3 Date: 01/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region