Blythe-Headgate Rock X-Brace Replacement CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Parker Dam Pole Replacement CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Blythe-Knob 161 Kilovolt Transmission Line, Pole Replacements at Interstate 10 Crossing CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
Gila Substation Stage 07 Rebuild Project and Related Communications Equipment Replacement CX(s) Applied: B4.11Date: 07/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Sonora Substation Antenna Pole Addition CX(s) Applied: B1.19Date: 07/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Dome Tap-Wellton Mohawk Ligurta - Replace Structure CX(s) Applied: B1.3Date: 07/01/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Ground Wire Repair on Transmission Structures CX(s) Applied: B1.3Date: 05/04/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Desert Southwest Region
Liberty Substation Mowing CX(s) Applied: B1.3Date: 05/04/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Oracle-Saguaro 115 Kilovolt Transmission Line Routine Maintenance Project CX(s) Applied: B1.3Date: 05/04/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Mead Substation Stage 15- Foundation Rebuilds and Transformer Connections CX(s) Applied: B4.6Date: 04/23/2015 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region