Parker Dam to Gila 161-kilovolt Transmission Line, Cross Arm Replacement at Structure 0/7 CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
July 22, 2013"Parker Dam to Gila 161-kilovolt Transmission Line, Cross Arm Replacement at Structure 0/7
CX(s) Applied: B1.3
Date: 07/22/2013
Location(s): California
Offices(s): Western Area Power Administration-Desert Southwest Region
Western proposes to conduct cross arm replacements at a single wood H-frame structure located on the existing Parker Dam to Gila 161-kV transmission line."
CX(s) Applied: B1.3
Date: 07/22/2013
Location(s): California
Offices(s): Western Area Power Administration-Desert Southwest Region
Western proposes to conduct cross arm replacements at a single wood H-frame structure located on the existing Parker Dam to Gila 161-kV transmission line."