Protection and Communication Facilities Maintenance CX(s) Applied: B1.3, B1.7, B1.19 Date: 11/08/2013 Location(s): Arizona, Nevada, California, Utah Offices(s): Western Area Power Administration-Desert Southwest Region
Risk Assessment of Structural Integrity of Transportation Casks CX(s) Applied: B3.6 Date: 11/04/2013 Location(s): Utah Offices(s): Idaho Operations Office
Ceramatec, Inc. - Advanced Planar Li/S Battery CX(s) Applied: B3.6 Date: 10/31/2013 Location(s): Utah, Illinois, Texas Offices(s): Advanced Research Projects Agency-Energy
Solid Power, LLC--An Ultra High Energy, Safe and Low-Cost All Solid-State Rechargeable Battery for Electric Vehicles CX(s) Applied: B3.6 Date: 10/22/2013 Location(s): Colorado, Colorado, Michigan, Utah, New Mexico Offices(s): Advanced Research Project...
High Hydrogen, Low Methane Syngas from Low Ranked Coals for Coal-to-Liquids Production CX(s) Applied: B3.6 Date: 09/10/2013 Location(s): Utah Offices(s): National Energy Technology Laboratory
Novel Electro-Deoxygenation Process for Bio-oil Upgrading CX(s) Applied: A9, B5.15 Date: 08/26/2013 Location(s): Utah Offices(s): Golden Field Office
Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production CX(s) Applied: B5.12 Date: 07/22/2013 Location(s): Utah Offices(s): National Energy Technology Laboratory
Fracture Evolution Following Hydraulic Stimulations within EGS Reservoirs CX(s) Applied: A9, B3.1, B3.6 Date: 05/20/2013 Location(s): Utah Offices(s): Golden Field Office
Above-Ground Routine Transmission Line Maintenance CX(s) Applied: B1.3 Date: 05/17/2013 Location(s): Colorado, Wyoming, Nebraska, Montana, Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Substation Maintenance and Renovation Activities CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6 Date: 05/17/2013 Location(s): Colorado, Wyoming, Nebraska, Montana, Utah Offices(s): Western Area Power Administration-Rocky...