Low Cost Flexible Production System for Remote Ultra Deepwater Gulf of Mexico Field Development CX(s) Applied: A9, A11 Date: 06/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Low Cost Flexible Production System for Remote Ultra Deepwater Gulf of Mexico Field Development CX(s) Applied: A9 Date: 06/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
More Improvements to Deepwater Subsea Measurement CX(s) Applied: B3.6 Date: 06/14/2012 Location(s): Texas, Louisiana, New York, Oklahoma, Scotland Offices(s): National Energy Technology Laboratory
Ultra-Deepwater Riser Concepts for High Motion Vessels CX(s) Applied: A9 Date: 06/12/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Composite Riser for Ultra-Deepwater High Pressure Wells CX(s) Applied: A9, A11 Date: 06/04/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Composite Riser for Ultra-Deepwater High Pressure Wells CX(s) Applied: A9, A11 Date: 06/04/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
High Pressure Fire Loop and Lead-In Replacement in the MAA - Amendment 01 CX(s) Applied: B5.4 Date: 05/29/2012 Location(s): Texas Offices(s): Pantex Site Office
Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill RWIS Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Pilot Testing: Pretreatment Options to Allow Re-Use of Flowback Water CX(s) Applied: A9, B3.6 Date: 05/14/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory