Waste Heat Integration with Solvent Process for More Efficient Carbon Dioxide Removal from Coal-Fired Flue Gas CX(s) Applied: A9, A11, B3.6 Date: 04/27/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Waste Heat Integration with Solvent Process for More Efficient Carbon Dioxide Removal from Coal-Fired Flue Gas CX(s) Applied: A11 Date: 04/27/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Reverse-Circulation Primary Cementing CX(s) Applied: A9 Date: 04/25/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Interstate Electrification Improvement CX(s) Applied: B5.1, B5.23 Date: 04/25/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Reverse-Circulation Primary Cementing CX(s) Applied: B3.6 Date: 04/24/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Building 09-056 Demolition CX(s) Applied: B1.23 Date: 04/24/2012 Location(s): Texas Offices(s): Pantex Site Office
Rework Big Hill 36” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 04/19/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Re-work Bryan Mound 30” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Coil Tubing (CT) Drilling and Intervention System Using Cost-Effective Vessels CX(s) Applied: A9 Date: 04/06/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Consortium CX(s) Applied: A9 Date: 04/06/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory