Building 12-75B Expansion for UPS and Heating, Ventilation and Air Conditioning Upgrade CX(s) Applied: B1.15, B2.1Date: 03/17/2015 Location(s): TexasOffices(s): Pantex Site Office
Technology Integration Program CX(s) Applied: B3.1, B3.6Date: 03/04/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: B3.1, B3.6Date: 03/04/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Administrative Support Complex CX(s) Applied: B1.15Date: 02/26/2015 Location(s): TexasOffices(s): Pantex Site Office
LIBS, Laser Ablation, Glow Discharge Studies CX(s) Applied: B1.3Date: 02/23/2015Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Maintenance Clean the Big Hill Raw Water Intake Structure Pump Bay (GH-OM-1167) CX(s) Applied: B1.3Date: 02/23/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Temporary Back-Up Generator Installation CX(s) Applied: B1.3, B1.15, B1.31, B2.2Date: 02/22/2015 Location(s): TexasOffices(s): Pantex Site Office
Record of Categorical Exclusion Determination to Replace Piping Header at Bryan Mound RWIS and RWIP (BM-MM-1027) CX(s) Applied: B1.3Date: 02/18/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Houston Zero Emission Delivery Vehicle Deployment CX(s) Applied: A1, B3.6, B5.23Date: 02/09/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Big Hill Anhydrite Pond 9 Closure CX(s) Applied: B1.23Date: 01/26/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office