Bayou Choctaw Wi-Fi/Radio Replacement Pilot CX(s) Applied: B1.7Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423 CX(s) Applied: B1.4Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Big Hill Site Building Upgrades, Phase 2 CX(s) Applied: B1.3Date: 08/10/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Surface and Airborne Monitoring Technology for Detecting Geologic Leakage in a Carbon Dioxide-Enhanced Oil Recovery Pilot, Anadarko Basin, Texas CX(s) Applied: A9, B3.1Date: 08/03/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Replace 6" Piping at West Hackberry Disposal Wells CX(s) Applied: B1.3Date: 08/03/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Windows on Big Hill and Bryan Mound Entry Portal Buildings CX(s) Applied: B1.3Date: 08/03/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Pressure Management and Plume Control Strategies through a Brine Extraction Storage Test (BEST) at the Devine Test Site (DTS) in Texas CX(s) Applied: A1, A11, B3.1, B3.6Date: 07/28/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
High Fidelity Multiphase Computational Fluid Dynamic Model with Trilinos CX(s) Applied: A9Date: 07/24/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Offshore Carbon Dioxide Storage Resource Assessment of the Northern Gulf of Mexico (TX-LA) CX(s) Applied: A1, A9, B3.6Date: 07/10/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory