Subsea Produced Water Sensor Development (Addition of Sub-Recipient) CX(s) Applied: A9, A11, B3.6Date: 03/11/2016 Location(s): TexasOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
March 11, 2016Subsea Produced Water Sensor Development (Addition of Sub-Recipient)
CX(s) Applied: A9, A11, B3.6
Date: 03/11/2016
Location(s): Texas
Offices(s): National Energy Technology Laboratory
Design and configure a suitable flow loop to meet the required parameters leak test process; commission system, install OIWM, analytical analysis, and reporting.