Categorical Exclusion Determinations: Southwestern Power Administration

Line 3002 and 3002A Electrical Transmission Line Reconductoring Project CX(s) Applied: B2.5 Date: 05/22/2013 Location(s): Missouri, Missouri Offices(s): Southwestern Power Administration
Hydroelectric Power Rate Increase for the Robert Douglas Willis Hydropower Project CX(s) Applied: B4.3 Date: 07/30/2012 Location(s): Texas, Texas, Texas Offices(s): Southwestern Power Administration
Line 3010 Structure 38-44, 59 and 60 Transmission Structure Movement Project CX(s) Applied: B2.5 Date: 07/02/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration