Mingo Ditch Structure Replacement Project, Line 3007, Structures 930-932 (Part B4.6) CX(s) Applied: B4.6Date: 03/11/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Neosho to Carthage to LaRussell Transmission Line Upgrade and Rebuild Project (Part B4.6) CX(s) Applied: B4.6Date: 03/11/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Nixa Land Purchase and Communication Tower Construction Project (Part B1.19) CX(s) Applied: B1.19Date: 03/11/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 CX(s) Applied: B4.6Date: 02/26/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration