Mingo Ditch Structure Replacement Project, Line 3007, Structures 930-932 (Part B4.6) CX(s) Applied: B4.6Date: 03/11/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Neosho to Carthage to LaRussell Transmission Line Upgrade and Rebuild Project (Part B4.6) CX(s) Applied: B4.6Date: 03/11/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Nixa Land Purchase and Communication Tower Construction Project (Part B1.19) CX(s) Applied: B1.19Date: 03/11/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 CX(s) Applied: B4.6Date: 02/26/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
Sam Rayburn Dam Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
Southwestern Power Administration proposes to replace overhead ground wire with OPGW on its Springfield, MO to Nixa, MO, to Table Rock, MO, to Gran…
Line 3007 Structure Replacement Project for Flood Prone Areas CX(s) Applied: B4.6Date: 06/24/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration
Storm Shelter Control Project CX(s) Applied: B2.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration