Chimney Hill Solar Project Interconnection with PEC and Interface with the SWPA Tupelo Switchyard CX(s) Applied: A9Date: 03/03/2016 Location(s): OklahomaOffices(s): Southwestern Power Administration
Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 CX(s) Applied: B4.6Date: 02/26/2016 Location(s): MissouriOffices(s): Southwestern Power Administration
Robert Douglas Willis Hydropower Project Hydroelectric Power Rate Increase CX(s) Applied: B4.3Date: 11/20/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration
Tenkiller Dam and Norfolk Substation Protective Relay and Control Switchboard Panel Replacements CX(s) Applied: B1.3Date: 06/22/2015 Location(s): ArkansasOffices(s): Southwestern Power Administration