Doniphan Substation Backup Station Service Project CX(s) Applied: B4.6 Date: 05/05/2014 Location(s): Missouri Offices(s): Southwestern Power Administration
Office of NEPA Policy and Compliance
May 5, 2014Doniphan Substation Backup Station Service Project
CX(s) Applied: B4.6
Date: 05/05/2014
Location(s): Missouri
Offices(s): Southwestern Power Administration
Southwestern Power Administration proposes to replace the backup station service and AC/DC panel at Doniphan substation. The project will entail laying an underground cable within the substation.
CX(s) Applied: B4.6
Date: 05/05/2014
Location(s): Missouri
Offices(s): Southwestern Power Administration
Southwestern Power Administration proposes to replace the backup station service and AC/DC panel at Doniphan substation. The project will entail laying an underground cable within the substation.