Work in the 723-A High Pressure Laboratory CX(s) Applied: B3.6Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Development and Testing of Reactive Amendment Saltstone CX(s) Applied: B3.6Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 707-7F CX(s) Applied: B1.3Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 716-N CX(s) Applied: B1.3Date: 12/15/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Magnesium Chloride Testing CX(s) Applied: B3.6Date: 12/15/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repainting Portions of 902-1F and 902-2F Fire Water Storage Tanks CX(s) Applied: B1.3Date: 12/15/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Inhibited Water Header Drain Addition on Tank 11 and Tank 15 CX(s) Applied: B1.3Date: 12/11/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Removal of Leaked Normal Cooling Water (NCW) on 1st Level CX(s) Applied: B1.3Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Control of Algae at the 281-8H Basin CX(s) Applied: B1.6Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Cast Stone Testing Using Tank 50 CX(s) Applied: B3.6Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office