707-C Roof Replacement CX(s) Applied: B1.3 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Electrochemistry in Ionic Liquids CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operations in Laboratory 773-A, B135/139 CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
235-F Risk Reduction and Deactivation CX(s) Applied: B1.28 Date: 03/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Correct Obstruction in the Sprinkler System on Level 3 of HB-Line CX(s) Applied: B2.5 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Repair Sanitary Sewer Line South of 725-N CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Provide an Improved Heating, Ventilation and Air Conditioning System in 705-A CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Shipping Containers 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Digital Density Meter Analytical Capability in 735-A, D-wing CX(s) Applied: B3.6 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Well #ASH-06 Tie-In to A-Area Burning Rubble Pit (ABRP) Soil Vapor Extraction Unit (SVEU) CX(s) Applied: B6.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office