Cleaning of Uncontaminated Steel 3013 and 9975 Parts (Actual and Mockup) CX(s) Applied: B3.6 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Iodine Speciation CX(s) Applied: B3.6 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
2H Evaporator Scale Sample Analysis CX(s) Applied: B3.6 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Miscellaneous Housekeeping Tasks Around 245-F/245-1F CX(s) Applied: B1.28 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installing Vent/Drain on Inlet Headers of 292-H Recycle Vessel Vent Fans CX(s) Applied: B2.5 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Stiffen Canyon Exhaust Fan 3 Motor Pedestal CX(s) Applied: B2.5 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
242-16H Evaporator Acid Cleaning Process CX(s) Applied: B1.3 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
F-08 Industrial Wastewater Outfall Flow Measurement Improvements CX(s) Applied: B3.1 Date: 01/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Actinide Removal Process /Modular Caustic Side Solvent Extraction Unit Life Extension Support Testing CX(s) Applied: B3.6 Date: 01/24/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Removal of Glass Feed Prep System from 786-A (EDL) CX(s) Applied: B1.23 Date: 01/22/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office