Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary CX(s) Applied: B2.5 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8 CX(s) Applied: B2.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Additional Characterization Sampling at the Coal Pile Ash Basin 788-3A and the Ash Pile 788-A CX(s) Applied: B3.1 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Permanent Power for Saltstone Disposal Unit Construction CX(s) Applied: B4.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Process Solutions and Solids CX(s) Applied: B3.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
L-Area River Water Valve V-022 Bypass and Piping CX(s) Applied: B1.3 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Energy Frontiers Research Center - Nanoscale Actinide Materials CX(s) Applied: B3.6 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
H1616 O-Ring Aging Studies CX(s) Applied: B3.6 Date: 01/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office