Categorical Exclusion Determinations: South Carolina

Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary CX(s) Applied: B2.5 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8 CX(s) Applied: B2.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Additional Characterization Sampling at the Coal Pile Ash Basin 788-3A and the Ash Pile 788-A CX(s) Applied: B3.1 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office