SRNL is working to develop technology to perform imaging of processes conducted at the Savannah River Site. In this task we will perform imaging o…
Excavate to replace the defective domestic water valve DW-V-40 in H Area near 284-19H. Valve has failed between open and closed. …
Replace the tile flooring in the 701-1K Vestibule.…
Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
Determine Solubility and Vapor Pressure of Monomethyl Mercury in Tank Waste Simulants Using Milestone Direct Mercury Analyzer (DMA-80).…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
Subcontractor will provide renovations to 773-A, outside entrance canopy and surrounding area.…