Measurement of hydrogen generation from SRS Tank Farm actual-waste samples at a series of temperatures with and without addition of glycolate.…
Subcontractor will provide roof repairs at 617-11G. The Subcontractor will disturb the existing roof while performing these repairs on 617-11G. The…
The Savannah River Site Community Reuse Organization (SRSCRO) shall furnish labor, material, equipment, tools, PPE, and supplies necessary to perfo…
Valve and presumed asbestos containing material (PACM) gasket removal and replacement at H Base Injection.…
This EEC is for the placement and implementation of the N-Area Temporary Asbestos Storage Containment Area. This will involve receipt, storage, an…
Deactivation of 690-N Ford Building and Ancillary Structures / Equipment in preparation for Decommissioning (Demolition) of the facility.…
The Check Station Building at Crackerneck Wildlife Management Area and Ecological Reserve (CWMA&ER) is an open structure that provides South Caroli…
Replace Temperature Valve in AHU #5 & #6 with insulation/gasket removal and replacement as necessary.…
Building 233-H P-Evac Hydride Bed Replacement…
The Thomas Jefferson National Accelerator Facility (TJNAF or Jefferson Lab (J-Lab)) used a tritium filled vessel in a fundamental physics experimen…