Trailers are to be moved to support Saltstone Disposal Unit 7 construction.…
Remove, replace, reinstall HPC-TRP-002 (steam trap) associated piping, insulation (non-asbestos). There is an associated presumed asbestos contain…
Paint walls/door, replace floor tile, and ceiling tiles in Building 704-K Room 161 and prep/paint 704-K lunch room walls, doors, and replace ceilin…
As part of the C-Area Ground Water (CAGW) Removal Action and to reduce the risk of injury, Area Completion Projects will install handrails at the C…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…
Sealant to be applied on K-Area Disassembly Basin roof to prevent inleakage, as well as general housekeeping on K-Disassembly Basin roof.…
Small samples (less than 100 mg) of porous aluminosilicate zeolite material are analyzed in an Autosorb iQ gas sorption analyzer manufactured by Qu…
This scope of work covers activities associated with the development of electrolytic cell and catalyst reactor components for projects such as sulf…
SRNL will perform batch contact and column testing of Crystalline Silicotitanate (CST) Ion Exchange media with simulant waste supernate. …
Preparation of salt simulant solutions as well as cementitious waste forms that are representative of waste forms from SRS and offsite for testing.…