Removal of water, soil, and gravel will be required along with necessary repairs to prevent future wash-outs.…
Replace HT-TCAP Hydride Beds in Building 233-H.…
MOX-Termination has determined that portable building 252 (aka SRS-PB-01072) is now excess.…
782-3A Restroom floor repair.…
Extend breakroom on south side of Bldg. 717-8N.
The EEC covers the renovations for the interior of building 713-1N.…
704-1N carpet replacement.…
This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…
Piping will need to be removed and worked to fit the new filter. Some piping components will be replaced.…
Subcontractor will provide roof repairs at 705-H.…