This activity prepares H-Canyon and Outside Facilities (H-OF) samples for metal impurities analysis by either Inductively-Coupled Plasma Mass Spect…
This activity is for the potentiometric measurement of uranium (U) content for a wide variety of samples.…
The Barnwell Warehouse has six hydraulic units that were intended for the shuttered MOX project.…
Room 7 of 211-19H has experienced some water damage from a previous roof leak.…
Repair steam leak at reducer in 773-A A-0185 Cafeteria.…
Install and operate a new Woodworking Jointer and Spindle Sander at the 717-8N Carpenters Shop.…
The SRS fire department will replace current firefighting foams that contains PFAS with a more “green” alternative.…
The objective of this work is to characterize materials by performing electrochemical and corrosion tests at low temperatures or in the presence of…
Renovation to the exterior and interior of three office trailers-714-4S, 714-5S and 714-6S.…
Perform maintenance on building 241-110F as needed to repair subfloor beneath carpet, repair ceiling at leak damage locations - which shall include…