Remove the Inert Metallography Laboratory Tritium Recovery System (IML TRS) process chiller from service by providing air gap isolation of the chil…
Replace pipe flange on the HM Trailer east of 772-F.…
EandI Perform Layup Activities in Chase 163 by identifying and removing PCB ballasts from fluorescent light fixtures and removing fluorescent bulbs…
This work scope is to improve the drainage around the west sides of 772-F and 772-1F.…
Repairs will include but are not limited to air gapping and removal of conduit, excavation of unsuitable soil, compaction of soil, replacement of n…
This EEC covers all maintenance activities performed by Savannah River Tritium Enterprise (SRTE) organizations that have the potential to disturb g…
This EEC is part of the F/H Laboratory (FHL), 773-A Laboratory Modification Project.…
Due to a recent assessment of the air surveillance program at SRS, it has been decided to install a new air surveillance station to ensure thorough…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry method in 773…
This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal.…