Inspection and treatment of 115KVA poles south of SRS and crossing B-Road.…
Subcontractor will provide roof repairs at 704-H.…
Replace carpet, tile, and cove base in 705-C.…
Subcontractor will provide roof repairs at 790-4B.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
Award Number: DE-EE0008294, CX(s) Applied: B5.16, State Energy Program, Location(s): SC, Office(s): Golden Field Office
HRTL Lab 144 (HRTL High Bay) is utilized by the Hydrogen Isotopic Processing Section for the Hydrogen Processing Demonstration System (HPDS.)…
Generator (MG) sets in 251-F are reaching end of life expectancy and require a considerable amount of maintenance.…
Replace damaged ceiling tiles in 736-A.…
Relocate grinder and belt sander to opposite side of MillWright Shop, Building 711-9N.…