The 503-2A Diesel Generator (DG) was installed in 1984 and is functionally classified as General Services (GS) and used as a back-up generator.…
The objective of this work is to analyze for iodine speciation in environmental samples (aqueous and solids) by testing for iodide, iodate and orga…
Establishment and operation of a Rapid COVID Testing Station outside of S-Area (Defense Waste Processing Facility).…
Existing wooden entry stairs and landing platforms at buildings 718-N and 718-20N will be removed and replaced with metal/aluminum units.…
704-C Remove/replace carpet.…
Maintenance to upgrade SRTE lamps with LED.…
Relocate DI (Deionized) Water Supply 284-H.…
Install Universal Wiring (UW) in Building 706-5F.…
Replace neutralization tank located under lab sink in 782-3A.…
Lab modules C-142/146 and D-1169 are being renovated to house a new mission, Crystal Growth Lab for Nuclear Detection.…